Fitout has started

The Fitout stage started yesterday and after today the electrical fitout is basically done - an outdoor light hasn't been fitted and a powerpoint in the bathroom hasn't been done either.
I have electricals, taps, toilets and plumbing so really the house is almost done! The outdoor painting still hasn't been done but the weather is on the improve so hopefully soon.
Pitty work is being extremely stressful so I don't feel too excited about it :(

Photo's from the past few days

Chateau Lisa


Render




I have light switches and power points - the light switch is meant to be on the other side of the door though


My fancy light shade that the builder provides (one day they will be changed out) and energy saving light bulbs - will change these for warm light ones


I have a shower rail and mixer taps on the shower and basin


Taps for the bath, glad the spout reaches


POWERtainment


Outdoor tap


Laundry sink taps and spout


Washing machine taps and some plaster damage


Insulation has been delivered, I couldn't see any writing to say what R rating it is to make sure it was the correct type


Kitchen sink and my vegie sprayer tap have been put in


Ensuite mixer tap


Evidence of muddy tradies


Lights over my kitchen bench where I will one day put in pendants


Outdoor GPO


Outdoor light


Ensuite toilet

Saturday, August 29, 2009

More tiling photos but from inside

I had a bit of time to kill this morning so naturally I went up to my house :D I also managed to find a door that was left unlocked! Sweeeeeeet! I got lots of photo's and spent a long time checking out all the paint work - I'm VERY impressed with the painting!! There are some marks and scratches but they are probably from the tilers - it happens.
Also, happy to report that the previous photo's of the paint on the cabinet work has been fixed!

Side of bath (Chocolate Matt) and floor tiles (Agra Sandstone). The top of the bath will be the same as the side


Shower in the bathroom


Bath plumbing, the shape in the concrete makes sense now - that water is still there grrr


Toilet! I like how they have done the tiles in here (Agra Sandstone)


Laundry (Loft Walnut)


Kitchen (Loft Walnut)


Bathroom/ensuite/toilet floor tiles (Agra Sandstone) next to the kitchen/entrance/laundry (Loft Walnut)


Ensuite shower (Mulia Gloss white with a strip of Chocolate Matt). The Bathroom shower will have the same strip


Shower base and floor tile (Agra Sandstone)


Close up of the feature strip (Chocolate Matt)


Damaged vanity in the ensuite


Completed paintwork





Two deep scratches on the front door


Bath support - it's actually a row of bricks and then cement or something

Thursday, August 27, 2009

Bits N pieces

The inside painting has now been completed and the doors are back on! None of the outdoor painting has been done yet though. I spoke to the painters about the inside of the front door but I have also emailed N my CSA about it to ensure that it is re-painted.
The wet area's have also been water proofed, I have my bathtub and the tiles have all been delivered ready for a start tomorrow (hopefully!)

The photo's are from the past two days and are all taken through the windows.
I was asked to provide some picture of how thick the bench top is too, so they are below

The painting inside is completed and the doors are back on


The painting in the garage is completed


Bath hob has been water proofed


Bathroom shower is water proofed


Benchtop with carboard on top


Benchtop again with the cardboard on top


You can just see it, the corner of the ensuite shower hob has been water proofed


Delivery from Frank Walker! (National Tiles) - the long tube is also from them, no idea what's in it though - any thoughts?


Messages to the tiler


I have a bath tub!!!


Holding it up


mmmmmmmm Bath

Friday, July 3, 2009

I have a roof

Wow I have a roof and I love it!! It was weird and fantastic to be walking through my frame, under the roof while it was raining and I was dry!! YaY!!

Also, the bridge to Laurimar from Plenty Road opened today woohoo!

I also discovered today that I am responsible for the water bills so I rang N to see if they can do something about the water issue... anyway photo's!

Chateau Lisa - with a roof!! the tiles are Monier Barramundi


Garage roof tiles


The mud in my entrance hallway :(


The green pipe is the new pipe to my toilet for the water tank - the plumber has fixed it all up


Inside and under the roof tiles





Casualties


Roof tiles over the kitchen, meals and family


My house


A rainbow appeared over Mernda Villages as I was leaving


The bridge is open to Laurimar from Plenty Road and the rainbow finished there, I reckon it's landing on Andy's house!


Taken on the new bridge - I spy with my little eye..... :D