Wednesday, September 9, 2009

Fitout has started

The Fitout stage started yesterday and after today the electrical fitout is basically done - an outdoor light hasn't been fitted and a powerpoint in the bathroom hasn't been done either.
I have electricals, taps, toilets and plumbing so really the house is almost done! The outdoor painting still hasn't been done but the weather is on the improve so hopefully soon.
Pitty work is being extremely stressful so I don't feel too excited about it :(

Photo's from the past few days

Chateau Lisa


Render




I have light switches and power points - the light switch is meant to be on the other side of the door though


My fancy light shade that the builder provides (one day they will be changed out) and energy saving light bulbs - will change these for warm light ones


I have a shower rail and mixer taps on the shower and basin


Taps for the bath, glad the spout reaches


POWERtainment


Outdoor tap


Laundry sink taps and spout


Washing machine taps and some plaster damage


Insulation has been delivered, I couldn't see any writing to say what R rating it is to make sure it was the correct type


Kitchen sink and my vegie sprayer tap have been put in


Ensuite mixer tap


Evidence of muddy tradies


Lights over my kitchen bench where I will one day put in pendants


Outdoor GPO


Outdoor light


Ensuite toilet

2 comments:

  1. Really love those mixer taps! Must be very expensive upgrades ;)

    ReplyDelete
  2. Gawd no idea how much they are! I can't even find the paperwork right now either!

    ReplyDelete